PROCUREMENT

No. E-Procurement Published Date Briefing / Site Visit Date Closing Date Action
No. E-Procurement Published Date Briefing / Site Visit Date Closing Date Action
1 DESLUDGING AND CLEANING OF SSP1 PULSATORS STREAM A AND STREAM B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
2 DESLUDGING AND CLEANING OF SSP1 RAW WATER INTAKE CHAMBER 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
3 DESLUDGING AND CLEANING OF SSP1 WASH WATER RECOVERY TANK SAND TRAPS A & B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
4 REINSTATEMENT OF LAMELLA SUPPORT OF PULSATOR 1B & 3B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
5 REINSTATEMENT OF ROOF SLAB OF SLUDGE DISPOSAL PLANT (SDP) A & B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
6 REINSTATEMENT OF ROOF SLAB OF TREATED WATER PUMPING STATION (TWPS) BUILDING 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
7 TREE CUTTING AND UNDERGROWTH CLEARING WORKS AT MATANG PAGAR RESERVOIR COMPOUND AREA 14/08/2025 10:00 AM 21/08/2025 10:00 AM 10/09/2025 03:00 PM
8 DESLUDGING AND CLEANING OF SSP1 PULSATORS STREAM A AND STREAM B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
9 DESLUDGING AND CLEANING OF SSP1 RAW WATER INTAKE CHAMBER 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
10 DESLUDGING AND CLEANING OF SSP1 WASH WATER RECOVERY TANK SAND TRAPS A & B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
11 REINSTATEMENT OF LAMELLA SUPPORT OF PULSATOR 1B & 3B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
12 REINSTATEMENT OF ROOF SLAB OF SLUDGE DISPOSAL PLANT (SDP) A & B 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
13 REINSTATEMENT OF ROOF SLAB OF TREATED WATER PUMPING STATION (TWPS) BUILDING 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
14 TREE CUTTING AND UNDERGROWTH CLEARING WORKS AT MATANG PAGAR RESERVOIR COMPOUND AREA 14/08/2025 10:00 AM 21/08/2025 10:00 AM 24/09/2025 03:00 PM
15 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 1 6250KVA 6.6KV AT TREATMENT PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
16 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 2 6250KVA 6.6KV AT TREATMENT PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
17 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 1 2500KVA 6.6KV AT INTAKE PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
18 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 2 2500KVA 6.6KV AT INTAKE PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
19 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 1 6250KVA 6.6KV AT TREATMENT PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
20 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 2 6250KVA 6.6KV AT TREATMENT PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
21 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 1 2500KVA 6.6KV AT INTAKE PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
22 REFURBISHMENT OF ALTERNATOR SET FUJI SYNCHRONOUS GENERATOR NO 2 2500KVA 6.6KV AT INTAKE PLANT 18/06/2025 10:00 AM 25/06/2025 10:00 AM 10/07/2025 03:00 PM
23 REINSTATEMENT 400VA UPS STREAM B POST CHLORINE C/W INSTALLATION, TESTING & COMMISSIONING 04/06/2025 12:00 PM 11/06/2025 10:00 AM 26/06/2025 03:00 PM
24 REINSTATEMENT 2000VA UPS STREAM B CHEMICAL PLANT C/W INSTALLATION, TESTING & COMMISSIONING 04/06/2025 12:00 PM 11/06/2025 10:00 AM 26/06/2025 03:00 PM
25 REFURBISHMENT OF RAW WATER HT MOTOR NO P3 (FUJI 810KW, 6.6KV) 04/06/2025 12:00 PM 11/06/2025 10:00 AM 26/06/2025 03:00 PM
26 REFURBISHMENT OF RAW WATER HT MOTOR NO P8 (FUJI 810KW, 6.6KV) 04/06/2025 12:00 PM 11/06/2025 10:00 AM 26/06/2025 03:00 PM
27 REINSTATEMENT 400VA UPS STREAM B POST CHLORINE C/W INSTALLATION, TESTING & COMMISSIONING 04/06/2025 12:00 PM 11/06/2025 10:00 AM 20/06/2025 03:00 PM
28 REINSTATEMENT 2000VA UPS STREAM B CHEMICAL PLANT C/W INSTALLATION, TESTING & COMMISSIONING 04/06/2025 12:00 PM 11/06/2025 10:00 AM 20/06/2025 03:00 PM
29 REFURBISHMENT OF RAW WATER HT MOTOR NO P3 (FUJI 810KW, 6.6KV) 04/06/2025 12:00 PM 11/06/2025 10:00 AM 20/06/2025 03:00 PM
30 REFURBISHMENT OF RAW WATER HT MOTOR NO P8 (FUJI 810KW, 6.6KV) 04/06/2025 12:00 PM 11/06/2025 10:00 AM 20/06/2025 03:00 PM
31 REHABILITATION OF LOCAL CONTROL PANEL FOR CHLORINE VENTILATION AND SCRUBBER PLANT-PRE CHLORINE AT STREAM B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
32 REHABILITATION OF LOCAL CONTROL PANEL FOR CHLORINE VENTILATION AND SCRUBBER PLANT - POST CHLORINE AT STREAM B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
33 REHABILITATION OF LOCAL CONTROL PANEL FOR ALUMINIUM SULPHATE PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
34 REHABILITATION OF LOCAL CONTROL PANEL FOR FLUORIDE PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
35 REHABILITATION OF LOCAL CONTROL PANEL FOR LIME PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
36 REHABILITATION OF MAIN INSTRUMENT PANEL FOR MATANG PAGAR RESERVOIR 29/05/2025 10:00 AM 05/06/2025 10:00 AM 19/06/2025 03:00 PM
37 REHABILITATION OF LOCAL CONTROL PANEL FOR CHLORINE VENTILATION AND SCRUBBER PLANT-PRE CHLORINE AT STREAM B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
38 REHABILITATION OF LOCAL CONTROL PANEL FOR CHLORINE VENTILATION AND SCRUBBER PLANT - POST CHLORINE AT STREAM B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
39 REHABILITATION OF LOCAL CONTROL PANEL FOR ALUMINIUM SULPHATE PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
40 REHABILITATION OF LOCAL CONTROL PANEL FOR FLUORIDE PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
41 REHABILITATION OF LOCAL CONTROL PANEL FOR LIME PLANT AT STREAM A AND B 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
42 REHABILITATION OF MAIN INSTRUMENT PANEL FOR MATANG PAGAR RESERVOIR 29/05/2025 10:00 AM 05/06/2025 10:00 AM 04/07/2025 03:00 PM
43 TO SUPPLY AND DELIVER NEW PRESSURE RELIEF VALVE FOR CHLORINATION SYSTEM SSP1 19/05/2025 09:00 AM 23/05/2025 10:00 AM 10/06/2025 03:00 PM
44 TO SUPPLY AND DELIVER NEW VACUUM REGULATOR FOR CHLORINATION SYSTEM, SSP1 19/05/2025 09:00 AM 23/05/2025 10:00 AM 10/06/2025 03:00 PM
45 TO CARRY OUT REFURBISHMENT WORKS FOR GEARBOX BUTTERFLY VALVE DN 1800 19/05/2025 09:00 AM 23/05/2025 11:00 AM 10/06/2025 03:00 PM
46 TO SUPPLY, DELIVER AND INSTALL NEW DOSING PUMP SET (PERISTALTIC PUMP) FOR SSP1 PRE-POLY DOSING SYSTEM STREAM A 19/05/2025 09:00 AM 23/05/2025 11:00 AM 10/06/2025 03:00 PM
47 ACTUATOR REPLACEMENT AND PENSTOCK REFURBISHMENT WORKS 19/05/2025 09:00 AM 23/05/2025 03:00 PM 10/06/2025 03:00 PM
48 ACTUATOR REPLACEMENT FOR OUTLET CLEAR WATER TANK A AND B BUTTERFLY VALVE DN1800 19/05/2025 09:00 AM 23/05/2025 03:00 PM 10/06/2025 03:00 PM
49 TO SUPPLY, REPLACE AND INSTALL NEW pH METER AT SUNGAI SELANGOR PHASE 1, WTP 16/04/2025 10:00 AM 23/04/2025 10:00 AM 08/05/2025 03:00 PM
50 TO SUPPLY, REPLACE AND INSTALL LOW RANGE TURBIDIMETERS AT SUNGAI SELANGOR PHASE 1, WTP 16/04/2025 10:00 AM 23/04/2025 10:00 AM 08/05/2025 03:00 PM
51 TO SUPPLY, REPLACE AND INSTALL NEW pH METER AT SUNGAI SELANGOR PHASE 1, WTP 16/04/2025 10:00 AM 23/04/2025 10:00 AM 13/05/2025 03:00 PM
52 TO SUPPLY, REPLACE AND INSTALL LOW RANGE TURBIDIMETERS AT SUNGAI SELANGOR PHASE 1, WTP 16/04/2025 10:00 AM 23/04/2025 10:00 AM 13/05/2025 03:00 PM
53 Security Services for Sungai Harmoni Sdn Bhd, Loji Rawatan Air Sungai Selangor Fasa 1 for Year 2025- 2026 - Intake, Treatment Plant and Quarters, Bukit Mayong and Matang Pagar Reservoirs 06/03/2025 10:00 AM 13/03/2025 10:00 AM 27/03/2025 03:00 PM
54 TO CARRY OUT AIR EMISSION MONITORING AT SSP1 TREATMENT PLANT AND INTAKE PLANT 17/02/2025 03:00 PM 24/02/2025 03:00 PM 11/03/2025 03:00 PM
55 TO CARRY OUT AIR EMISSION MONITORING AT SSP1 TREATMENT PLANT AND INTAKE PLANT 17/02/2025 03:00 PM 24/02/2025 03:00 PM 13/03/2025 03:00 PM
56 TO SUPPLY, REPLACE AND INSTALL NEW pH METER AT SUNGAI SELANGOR PHASE 1, WTP 10/02/2025 03:00 PM 17/02/2025 10:00 AM 04/03/2025 03:00 PM
57 PROVISION OF HOUSEKEEPING AND CLEANING WORKS AT THE INTAKE CHAMBER AND BUILDING AREA 27/01/2025 10:00 AM 03/02/2025 10:00 AM 18/02/2025 03:00 PM
58 PROVISION OF GARDENING AND CLEANING SERVICES AT WATER TREATMENT PLANT PHASE 1 (SSP1) AREA 27/01/2025 10:00 AM 03/02/2025 10:00 AM 18/02/2025 03:00 PM
59 PROVISION OF HOUSEKEEPING AND CLEANING WORKS AT CHEMICAL BUILDINGS STREAM A AND B 27/01/2025 10:00 AM 03/02/2025 10:00 AM 18/02/2025 03:00 PM
60 RETENDER: TENDER FOR THE PERIODIC SERVICING AND MAINTENANCE OF AIR CONDITIONING UNITS AT SSP1 WATER TREATMENT PLANT FOR A PERIOD OF YEAR 2025. 17/12/2024 10:00 AM 24/12/2024 10:00 AM 08/01/2025 03:00 PM
61 To Construct a New Schedule Waste Store 09/10/2024 03:00 PM 15/10/2024 09:30 AM 30/10/2024 03:00 PM
62 To Construct a New VIP Dinner Room & Indoor Fitness Room 09/10/2024 03:00 PM 15/10/2024 09:30 AM 30/10/2024 03:00 PM
63 Yearly Contract for Incoming Sample/ Chemical Testing and Research Sample Period of 24 Months 09/10/2024 10:00 AM 16/10/2024 10:00 AM 05/11/2024 03:00 PM
64 Yearly Contract for Water Quality Testing on Raw Water Period-24 Month 09/10/2024 10:00 AM 16/10/2024 10:00 AM 05/11/2024 03:00 PM
65 Yearly Contract for Water Quality Testing on Treated Water Period-24 Month 09/10/2024 10:00 AM 16/10/2024 10:00 AM 05/11/2024 03:00 PM
66 To Carry Out Repair Work on Scrapper Thickening Tank Stream B 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
67 To Install New Actuator for Inlet Penstock Thickening Tank Stream A and B Sludge Plant 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
68 To Service and Recondition 6 units Penstock on Wash Water Recovery Tank Sludge Plant Stream A & B 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
69 To supply tools, labour, equipment and material for supply copper oil cooler 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
70 To supply, deliver and install new piping (poly pipe – HDPE) for high pressure water Sludge House Stream A. 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
71 To supply, deliver and install new piping (poly pipe – HDPE) for high pressure water Sludge House Stream B. 09/10/2024 10:00 AM 14/10/2024 03:00 PM 29/10/2024 03:00 PM
72 Rehabilitation of Filter 3B 08/10/2024 10:00 AM 15/10/2024 10:00 AM 04/11/2024 03:00 PM
73 To Construct a New VIP Dinner Room & Indoor Fitness Room 08/10/2024 10:00 AM 15/10/2024 10:00 AM 04/11/2024 03:00 PM
74 Repainting of SSP1 Admin Building. 08/10/2024 10:00 AM 15/10/2024 10:00 AM 04/11/2024 03:00 PM
75 To Construct New Vehicle Parking Shed of Admin Building. 25/09/2024 10:00 AM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
76 To Construct a New Schedule Waste Store 24/09/2024 05:00 PM 26/09/2024 10:00 AM 03/10/2024 03:00 PM
77 To Provide Media Cleaning Works of Filters 17A, 21A & 23A 24/09/2024 05:00 PM 26/09/2024 10:00 AM 03/10/2024 03:00 PM
78 To Construct a New Schedule Waste Store 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
79 To Provide Media Cleaning Works of Filters 17A, 21A & 23A 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
80 Repainting of SSP1 S-Bend Pipes of Treated Water Matang Pagar Pipelines A & B 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
81 Rehabilitation of Filter 3B 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
82 To Construct a New VIP Dinner Room & Indoor Fitness Room 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
83 Repainting of SSP1 Admin Building. 24/09/2024 05:00 PM 27/09/2024 09:30 AM 04/10/2024 03:00 PM
84 Repainting of SSP1 S-Bend Pipes of Treated Water Matang Pagar Pipelines A & B 24/09/2024 10:00 AM 03/10/2024 10:00 AM 26/09/2024 03:00 PM
85 UPGRADING WATER QUALITY ONLINE MONITORING SYSTEM AT INTAKE PLANT 02/09/2024 02:00 PM 06/09/2024 09:30 AM 24/09/2024 03:00 PM
86 UPGRADING WATER QUALITY ONLINE MONITORING SYSTEM AT INTAKE PLANT 02/09/2024 02:00 PM 06/09/2024 09:30 AM 27/09/2024 03:00 PM
87 THE MANAGEMENT & TRANSFER OF SLUDGE AND ASSOCIATED WORKS AT THE SUNGAI SELANGOR WATER TREATMENT WORKS PHASE 1 (SSP1) YEAR 2024 to 2026 14/08/2024 03:00 PM 23/08/2024 10:00 AM 10/09/2024 03:00 PM
88 UPGRADING AND INSTALLATION INDOOR AND OUTDOOR WIFI SYSTEM AT SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 06/08/2024 12:00 PM 12/08/2024 10:00 AM 27/08/2024 03:00 PM
89 TO APPOINT DEDICATED VENDOR TO SUPPLY SUNGAI SELANGOR PHASE 1 STAFF UNIFORM FOR YEAR 2024 02/08/2024 12:00 PM 07/08/2024 10:00 AM 21/08/2024 03:00 PM
90 UPGRADING AND INSTALLATION INDOOR AND OUTDOOR WIFI SYSTEM AT SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 02/08/2024 10:00 AM 06/08/2024 10:00 AM 21/08/2024 03:00 PM
91 RETENDER: TO SUPPLY, DELIVER, INSTALL AND COMMISSIONING NEW BAG FILTER UNIT FOR FLUORIDE CHEMICAL PLANT 26/07/2024 10:00 AM 01/08/2024 03:00 PM 20/08/2024 03:00 PM
92 RETENDER: TO SUPPLY, DELIVER, INSTALL AND COMMISSIONING NEW BAG FILTER UNIT FOR POLY CHEMICAL PLANT 26/07/2024 10:00 AM 01/08/2024 03:00 PM 20/08/2024 03:00 PM
93 TO SUPPLY AND DELIVER TREATED WATER PUMP (BIG), 2164 L/S MECHANICAL SEAL FACES 280 MM TO SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 25/07/2024 02:00 PM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
94 TO SUPPLY AND DELIVER TREATED WATER PUMP (SMALL) 1082 L/S MECHANICAL SEAL FACES 190 MM TO SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 25/07/2024 02:00 PM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
95 TO SUPPLY AND DELIVER RAW WATER BIG PUMP MECHANICAL SEAL FACES 200 MM TO SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 25/07/2024 02:00 PM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
96 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT WORKS OF RAW WATER PUMP NO.2 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
97 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT OF RAW WATER PUMP P7 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
98 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT OF TREATED WATER PUMP P2 MATANG PAGAR 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
99 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT OF TREATED WATER PUMP M4 BUKIT MAYONG 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
100 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT OF RAW WATER PUMP P2 DELIVERY BUTTERFLY VALVE AND CHECK VALVE 25/07/2024 10:00 AM 01/08/2024 03:00 PM 20/08/2024 03:00 PM
101 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR EFURBISHMENT OF RAW WATER PUMP P7 DELIVERY BUTTERFLY VALVE AND CHECK VALVE 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
102 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND CONSUMABLE ITEM FOR REFURBISHMENT OF TREATED WATER PUMP STATION MATANG PAGAR P2 DELIVERY BUTTERFLY VALVE AND CHECK VALVE 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
103 TO SUPPLY SKILLED LABOUR, TOOLS, MATERIALS AND ALL CONSUMABLE ITEM FOR REFURBISHMENT OF TREATED WATER PUMP BUKIT MAYONG M4 DELIVERY BUTTERFLY VALVE AND CHECK VALVE 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
104 TO SUPPLY AND DELIVER RAW WATER SMALL PUMP MECHANICAL SEAL FACES 155 MM TO SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
105 TO SUPPLY AND DELIVER SEAL FACES FOR BUKIT MAYONG TREATED WATER PUMP STATION M1, M2, M3, M4 AND M5 25/07/2024 10:00 AM 01/08/2024 10:00 AM 20/08/2024 03:00 PM
106 PROCUREMENT GALTECH 001 24/07/2024 04:42 PM - 24/07/2024 05:42 PM
107 TO PROVIDE CONSULTATION SERVICES IN OBTAINING THE CERTIFICATION OF BUSINESS CONTINUITY MANAGEMENT SYSTEM (ISO 22301:2019) FOR SUNGAI HARMONI SDN BHD (SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT) 22/07/2024 10:00 AM 31/07/2024 10:00 AM 14/08/2024 03:00 PM
108 YEARLY SERVICE CONTRACT FOR MAINTENANCE OF CCTV SYSTEM AT SSP1 (2024 – 2025) Period of 12 months (Quarterly Service). 12/07/2024 10:00 AM 17/07/2024 10:00 AM 01/08/2024 03:00 PM
109 REINSTATEMENT 400VA UPS STREAM A POST CHLORINE C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
110 REINSTATEMENT 400VA UPS STREAM A PRE CHLORINE C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
111 REINSTATEMENT 400VA UPS STREAM B PRE CHLORINE C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
112 REINSTATEMENT 240VAC 10 KVA UPS ADMIN BUILDING SERVER ROOM C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
113 REINSTATEMENT 1000VA UPS MATANG PAGAR RESEVOIR C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
114 REINSTATEMENT 2000VA UPS STREAM A CHEMICAL PLANT C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
115 REINSTATEMENT OF BATTERY CHARGER 24VDC INSTRUMENT MATANG PAGAR RESEVOIR C/W INSTALLATION, TESTING & COMMISSIONING 05/07/2024 10:00 AM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
116 REFURBISHMENT OF TREATED WATER HT MOTOR NO P2 (FUJI 1450KW, 6.6KV) 04/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
117 REFURBISHMENT OF TREATED WATER HT MOTOR NO P4 (FUJI 2900KW, 6.6KV) 04/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
118 REFURBISHMENT OF RAW WATER HT MOTOR NO P6 (FUJI 810KW, 6.6KV) 04/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
119 REFURBISHMENT OF RAW WATER HT MOTOR NO P7 (FUJI 810KW, 6.6KV) 04/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
120 REFURBISHMENT OF RAW WATER HT MOTOR NO P10 (FUJI 810KW, 6.6KV) 04/07/2024 03:00 PM 11/07/2024 10:00 AM 25/07/2024 03:00 PM
121 PROVISION OF SCHOOL BUS SERVICES FOR CHILDREN OF SUNGAI HARMONI SON BHD EMPLOYEES FOR THE YEAR OF 2024/2025 10/05/2024 03:00 PM 15/05/2024 09:30 AM 21/05/2024 03:00 PM
122 Yearly Contract For Service and Calibration Weighing Equipment at SSP1 10/05/2024 03:00 PM 15/05/2024 03:00 PM 29/05/2024 03:00 PM
123 CONSULTATION SERVICES FOR MIGRATION ISO/IEC27001:2013 to ISO/IEC 27001:2022 07/05/2024 10:00 AM 14/05/2024 10:00 AM 29/05/2024 03:00 PM
124 CONSULTATION SERVICES ISO 45001 CERTIFICATION (SSP1) 30/04/2024 12:00 PM 09/05/2024 10:00 AM 23/05/2024 03:00 PM
125 TO SUPPLY, DELIVER, INSTALL AND COMMISSIONING NEW BAG FILTER UNIT FOR FLUORIDE CHEMICAL PLANT 24/04/2024 03:00 PM 30/04/2024 09:30 AM 14/05/2024 03:00 PM
126 TO SUPPLY, DELIVER, INSTALL AND COMMISSIONING NEW BAG FILTER UNIT FOR POLY CHEMICAL PLANT 24/04/2024 03:00 PM 30/04/2024 09:30 AM 14/05/2024 03:00 PM
127 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM A 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
128 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM B 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
129 REHABILITATION OF SUPERVISORY PANEL NO. 9 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
130 REHABILITATION OF SUPERVISORY PANEL NO. 10 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
131 REHABILITATION OF SUPERVISORY PANEL NO. 11 STREAM A at PRE-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
132 REHABILITATION OF SUPERVISORY PANEL NO. 12 STREAM A at POST-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 18/04/2024 03:00 PM
133 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM A 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
134 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM B 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
135 REHABILITATION OF SUPERVISORY PANEL NO. 9 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
136 REHABILITATION OF SUPERVISORY PANEL NO. 10 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
137 REHABILITATION OF SUPERVISORY PANEL NO. 11 STREAM A at PRE-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
138 REHABILITATION OF SUPERVISORY PANEL NO. 12 STREAM A at POST-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 25/04/2024 03:00 PM
139 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM A 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
140 REHABILITATION OF MAIN INSTRUMENT PANEL STREAM B 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
141 REHABILITATION OF SUPERVISORY PANEL NO. 9 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
142 REHABILITATION OF SUPERVISORY PANEL NO. 10 STREAM A at CHEMICAL PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
143 REHABILITATION OF SUPERVISORY PANEL NO. 11 STREAM A at PRE-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
144 REHABILITATION OF SUPERVISORY PANEL NO. 12 STREAM A at POST-CHLORINATION PLANT 19/03/2024 03:00 PM 26/03/2024 09:30 AM 30/04/2024 03:00 PM
145 TO SUPPLY AUTOMATIC COLONY COUNTER WITH PC 21/02/2024 03:00 PM 27/02/2024 10:00 AM 13/03/2024 03:00 PM
146 RUBBISH COLLECTION AND DISPOSSAL OF SSP1 TREATMENT PLANT’S STAFF QUARTERS, INTAKE AND MATANG PAGAR RESERVOIR’S STAFF QUARTERS. 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
147 GRASS CUTTING OF SSP1 RAW WATER PIPELINES RESERVE AND SLUDGE DEPOSITORY AREA PERIMETER 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
148 GRASS CUTTING OF SSP1 MATANG PAGAR TREATED WATER PIPELINES RESERVE 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
149 DESLUDGING AND CLEANING OF SSP1 PULSATORS STREAM A AND STREAM B 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
150 DESLUDGING AND CLEANING OF SSP1 RAW WATER INTAKE CHAMBER 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
151 DESLUDGING AND CLEANING OF SSP1 WASH WATER RECOVERY TANK SAND TRAPS A & B 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
152 GRASS CUTTING OF BUKIT MAYONG RESERVOIR AND MATANG PAGAR RESERVOIR RESERVE AREA AND ACCESS ROAD 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
153 GRASS CUTTING OF SSP1 TREATMENT PLANT COMPOUND AREA 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
154 GRASS CUTTING OF SSP1 INTAKE AND STAFF QUARTERS 24/01/2024 03:30 PM 01/02/2024 10:00 AM 15/02/2024 03:00 PM
155 Replacement Works of New Chlorine Evaporator 10000-12000 PPD (200-240 kg/h) for Post-Chlorine Stream A, SSP1 Chlorination (2A) 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
156 Replacement Works of New Chlorine Evaporator 10000-12000 PPD (200-240 kg/h) for Post-Chlorine Stream B, SSP1 Chlorination (2B) 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
157 To supply and deliver new PRV set for SSP1 chlorination 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
158 To supply and deliver new Vacuum Regulator to SSP1 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
159 Replacement Works of New Chlorine Evaporator 10000-12000 PPD (200-240 kg/h) for Pre-Chlorine Stream A, SSP1 Chlorination (no 2) 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
160 Replacement Works of New Chlorine Evaporator 10000-12000 PPD (200-240 kg/h) for Pre-Chlorine Stream B, SSP1 Chlorination (no 2) 12/01/2024 02:30 PM 19/01/2024 10:00 AM 13/02/2024 03:00 PM
161 To fabricate, and supply new band screen conveyor chain for Intake Plant, SSP1 12/01/2024 02:30 PM 19/01/2024 03:30 PM 13/02/2024 03:00 PM
162 To Reinstate Storage Area for Fluoride Powder Stock 12/01/2024 02:30 PM 19/01/2024 03:30 PM 13/02/2024 03:00 PM
163 Tender for the periodic servicing and maintenance of air conditioning units at SSP1 WTP for a period of year 2024. 12/01/2024 10:00 AM 19/01/2024 10:00 AM 07/02/2024 03:00 PM
164 Tender for the periodic servicing and maintenance of air conditioning units at SSP1 WTP for a period of year 2024. 12/01/2024 10:00 AM 18/01/2024 10:00 AM 07/02/2024 03:00 PM
165 REINSTATEMENT OF BATTERY CHARGER 24VDC 30A AT RIVER GATE C/W INSTALLATION, TESTING & COMMISSIONING 13/12/2023 12:00 PM 20/12/2023 09:30 AM 27/12/2023 03:00 PM
166 PROPOSED RESIDUALS DISPOSAL WORKS FOR SUNGAI SELANGOR PHASE 1 (SSP1) WATER TREATMENT PLANT 27/11/2023 10:00 AM - 06/12/2023 03:00 PM
167 PROPOSED RESIDUALS DISPOSAL WORKS FOR SUNGAI SELANGOR PHASE 1 (SSP1) WATER TREATMENT PLANT 27/11/2023 10:00 AM - 06/12/2023 03:00 PM
168 MEMBEKAL DAN MENGHANTAR BAHAN KIMIA PEMPROSESAN AIR KE LOJI RAWATAN AIR SUNGAI SELANGOR FASA 1 (SSP1),KM3,JALAN BUKIT BADONG,45600 BESTARI JAYA,SELANGOR DARUL EHSAN.(SUNGAI HARMONI SDN BHD) UNTUK TEMPOH SATU (1) TAHUN SERTA KERJA-KERJA BERKAITAN 15/11/2023 02:30 PM 23/11/2023 10:00 AM 05/12/2023 03:00 PM
169 TO SUPPLY 4 UNITS ELECTROMAGNETIC FLOW METER FOR AERATOR OUTFLOW AT STREAM A AND B 08/11/2023 10:00 AM 15/11/2023 09:30 AM 30/11/2023 03:00 PM
170 TO SUPPLY 4 UNITS ELECTROMAGNETIC FLOW METER FOR AERATOR OUTFLOW AT STREAM A AND B 08/11/2023 10:00 AM 15/11/2023 09:30 AM 30/11/2023 03:00 PM
171 GTS-2/25102023 25/10/2023 02:50 PM 25/10/2023 02:50 PM 25/10/2023 03:10 PM
172 GTS-2/25102023 25/10/2023 02:50 PM 25/10/2023 02:50 PM 25/10/2023 03:10 PM
173 TENDER GTS-1/25102023 GTS-1/25102023 25/10/2023 10:40 AM 25/10/2023 10:40 AM 25/10/2023 11:00 AM
174 GTS-3/2023 24/10/2023 09:30 PM 24/10/2023 09:30 PM 24/10/2023 09:45 PM
175 GTS-2/2023 24/10/2023 07:00 PM 24/10/2023 06:15 PM 24/10/2023 08:00 PM
176 GTS-1/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 25/10/2023 10:45 AM
177 GTS-4/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 24/10/2023 11:00 PM
178 GTS-4/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 24/10/2023 11:00 PM
179 GTS-4/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 24/10/2023 11:00 PM
180 GTS-4/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 24/10/2023 11:00 PM
181 GTS-4/2023 24/10/2023 04:50 PM 24/10/2023 04:47 PM 24/10/2023 11:00 PM
182 PROCUREMENT GALTECH 002 20/10/2023 04:59 PM 20/10/2023 04:59 PM 20/10/2023 05:50 PM
183 PROCUREMENT GALTECH 002 20/10/2023 04:59 PM 20/10/2023 04:59 PM 20/10/2023 05:30 PM
184 PROCUREMENT GALTECH 001 20/10/2023 04:42 PM 20/10/2023 04:56 PM 20/10/2023 05:42 PM
185 PROCUREMENT GALTECH 001 20/10/2023 04:42 PM 20/10/2023 04:56 PM 20/10/2023 05:42 PM
186 REINSTATEMENT OF DAMAGED SLAB SOFFIT 22/09/2023 04:00 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
187 RESURFACING ROAD CHEMICAL BUILDING 22/09/2023 04:00 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
188 REINSTATEMENT CLEAR WATER TANK VENTS 22/09/2023 04:00 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
189 PROVISION OF CLEANING WORKS FOR THE INTAKE CHAMBER AND BUILDING 21/09/2023 03:30 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
190 PROVISION OF GARDENING AND CLEANING SERVICES FOR THE WATER TREATMENT PLANT PHASE 1 21/09/2023 03:30 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
191 PROVISION OF HOUSEKEEPING AND CLEANING WORKS AT CHEMICAL BUILDINGS STREAM A AND STREAM B 21/09/2023 03:30 PM 26/09/2023 09:30 AM 10/10/2023 03:00 PM
192 INSTALLATION OF WATER METER AT SUNGAI SELANGOR PHASE 1 STAFF QUARTERS 21/09/2023 10:00 AM 26/09/2023 09:30 AM 12/10/2023 03:00 PM
193 REHABILITATION FILTER 12B AT SUNGAI SELANGOR PHASE 1 WATER TREATMENT PLANT 21/09/2023 10:00 AM 26/09/2023 09:30 AM 12/10/2023 03:00 PM
194 UPGRADING WORKS FOR BRIEFING ROOM 21/09/2023 10:00 AM 26/09/2023 09:30 AM 12/10/2023 03:00 PM
195 YEARLY CONTRACT FOR CONDITION BASED-MONITORING PROGRAM 2023-2024 (THERMOGRAPHY, ULTRASOUND, VIBRATION AND PARTIAL DISCHARGE MONITORING) 15/09/2023 09:30 AM 19/09/2023 09:30 AM 26/09/2023 03:00 PM
196 TO CARRY ON SERVICING WORK ON PENSTOCK SDP STREAM A AND B WASH WATER RECOVERY TANK. 07/09/2023 10:00 AM 13/09/2023 09:30 AM 03/10/2023 03:00 PM
197 TO BUILD UP PROPER EXISTING STORAGE FOR FLUORIDE POWDER STOCK. 07/09/2023 10:00 AM 13/09/2023 09:30 AM 03/10/2023 03:00 PM
198 NEW COMPACT WALL CABINET CHLORINATOR (200 kg/h) FOR POST CHLORINATION SYSTEM #4A 07/09/2023 10:00 AM 13/09/2023 09:30 AM 03/10/2023 03:00 PM
199 TO SUPPLY AND DELIVER NEW VACUUM REGULATOR TO SSP1 FOR CHLORINATION SYSTEM POST AND PRE CHLORINE PLANT. 07/09/2023 10:00 AM 13/09/2023 09:30 AM 03/10/2023 03:00 PM
200 SECURITY SERVICES FOR SHSB 2023 - 2024 29/08/2023 10:58 AM 06/09/2023 09:30 AM 21/09/2023 03:00 PM
No. E-Procurement Published Date Briefing / Site Visit Date Closing Date Action
1 GTS-2/2023 24/10/2023 07:00 PM 24/10/2023 06:15 PM 24/10/2023 08:00 PM